Nhà máy xử lý nước thải KCN Yên Mỹ II góp phần "đón sóng" nhiều doanh nghiệp lớnNhà máy xử lý nước thải KCN Yên Mỹ II góp phần "đón sóng" nhiều doanh nghiệp lớnToàn cảnh từ trên cao nhà máy xử lý nước thải KCN Yên Mỹ II

Yen My II Industrial Park wastewater treatment plant contributes to "catching waves" of many large enterprises

18/08/2021 11:10

Yen My II Industrial Park wastewater treatment plant has a total capacity of 12,000 m3 / day, using a physico-chemical treatment system combined with biology by Ecoba Environmental Technology Co., Ltd (Ecoba ENT) as the main contractor.

Yen My II Industrial Park has a total area of 300 ha, is a multi-industry concentrated industrial zone established by the Vietnamese Government in 2015 by Hoa Phat Group as an investor and infrastructure trader.

With a methodical, synchronous investment in technical infrastructure and professional management, Yen My II Industrial Park is an attractive destination for big brands from many countries around the world. such names as Kokwang Industry Vietnam (Korea), Mingshin Vietnam (Hong Kong), Uni – President (Taiwan)… In which, the wastewater treatment system in Yen My II Industrial Park is highly appreciated by investors.

Yen My II Industrial Park is an attractive destination for investors. Photo source: Hoa Phat

Ecoba ENT has cooperated with Hoa Phat Group in many projects such as: Wastewater treatment station of livestock farms in Bac Giang, Hoa Binh; Wastewater treatment station for color coated steel sheet factory, furniture… At the Yen My II Industrial Park wastewater treatment plant project phase 1, Ecoba ENT was trusted by Hoa Phat investor and assigned to take on the role of main contractor.

The Yen My II Industrial Park wastewater treatment plant phase 1, uses a combination of biological and chemical treatment systems. All industrial wastewater and domestic wastewater from factories in the Industrial Park are treated locally to meet the requirements before being discharged into the common wastewater system of the whole Industrial Park. Wastewater at Yen My II Industrial Park wastewater treatment plant phase 1, after being treated, meets the requirements in column A according to Vietnamese standards on industrial wastewater No. 40:2011/BTNMT.

The Yen My II Industrial Park wastewater treatment plant phase 1 has been put into operation. After being put into operation, the wastewater treatment plant has solved the  wastewater treatment needs of the industrial park, ensuring a standard water source before being discharged into the environment, playing an important role in creating the green, clean, beautiful environment. This is also an important factor to help investors feel secure in choosing and renting factories in Yen My II Industrial Park.

Panoramic video from above the wastewater treatment plant of Yen My II Industrial Park during the construction phase

In particular, the clean water treatment system in phase 1 of Yen My II Industrial Park was also trusted by Hoa Phat investor and assigned to Ecoba ENT as the general contractor. In operation since 2018, the clean water treatment plant implemented by Ecoba ENT has greatly contributed to reducing the amount of input water, saving water supply, and minimizing the amount of polluted wastewater discharged into the receiving source and ensure sustainable environmental sanitation for Yen My II Industrial Park.

Yen My II Industrial Park is planned to attract investment in clean production sectors and industries with low impact on the environment such as manufacturing electrical equipment, electronic, and refrigeration equipment, products from new technologies; manufacturing, mechanical engineering, machinery and equipment, production of consumer goods (excluding projects in the textile and garment industry, thick leather, processing agricultural products and food). Since coming into operation, Yen My II Industrial Park (Hung Yen) has continuously “welcomed” many large domestic and foreign enterprises to rent land for factories.

For many years, stable and sustainable development according to the criteria of green, clean and environmental protection has always been the goal that Hoa Phat aims to. The investment in building a wastewater treatment system and a synchronous and modern water treatment system is a concrete and practical action to demonstrate Hoa Phat’s prestige and social responsibility in its Industrial Park  development strategy.

The modern wastewater treatment plant of Yen My II Industrial Park is one of the attractive infrastructure facilities for investors

In addition, the fact that Ecoba ENT is trusted to be selected as the main contractor of the wastewater and clean water treatment system of Yen My II Industrial Park in particular as well as in other projects of Hoa Phat investor in general has contributed to the success of the project  which proves the prestige and capability of Ecoba ENT in the market.

If you want to visit and learn about Yen My II Industrial Park Wastewater Treatment Plant, or ask for environmental advice, please contact Ecoba ENT via hotline: 0901 68 7788 | 08 8899 0789 | 08 9966 0789.



Others news