One of the transparent and crucial operations in which Ecoba ENT is particularly engaged in the periodic inspection and repair of machinery and control systems. On the morning of July 14, 2022, Ecoba ENT experts tested and maintained the machine system and control center at the Vinhomes Smart City wastewater treatment facility in Nam Tu Liem, Hanoi.
At the factory, the technical team performed consecutive tests by the right method for the entire range of items: Check the operation of the garbage separator, booster pumps, sewage pumps, slurry pumps, chemical pumps, submersible stirrer, agitator motor, reducer motor, measuring devices, air blowers, and exhaust fans, the electrical cabinet system, sludge dewatering, the online monitoring station system, and other jobs.
The technical staff at Ecoba ENT inspects the materials.
Regular inspections enable the wastewater treatment plant’s control system to work properly, guaranteeing that the facility operates following the procedure as pledged to the owner by the contractor Ecoba ENT. Vinhomes Smart City urban area is a Vingroup venture.
Overview of Vinhomes Smart City wastewater treatment plant
The wastewater treatment plant in Vinhomes Smart City’s Nam Tu Liem urban area began construction in May 2020 and is expected to be finished, turned over, and operational by the end of 2020. This is Vingroup’s second investment in an urban region. Green technology investment and implementation after Vinhomes Ocean Park Gia Lam urban area (capacity 38,000 m3 / day and night). The investor Vingroup has continued to allocate the contract to Ecoba ENT to develop and install the factory using Green technology in two metropolitan regions due to the stable operation, maintenance policy, and timely maintenance. Vingroup’s next major city is the Vinhomes Grand Park urban area, which has a capacity of 13,500 m3/day, and the Vinhomes Ocean Park 2- The Empire urban area, which will open on July 6, 2022. The use of Green Technology in urban environments enables wastewater treatment facilities to be “greener,” more ecologically friendly, and in harmony with the urban landscape, particularly by assisting investors in optimizing and lowering total operating costs.
Vinhomes Smart City’s wastewater treatment plant uses green technologies
Not only is Ecoba ENT a leader in the application of technology, particularly Green technology, but it is also a well-respected organization in warranty and routine maintenance of the projects for which it serves as a contractor. All customers who need to check to see if their system is running steadily or if any errors need to be corrected or not are entitled to free periodic inspection of wastewater treatment facilities and water supply.
A team of highly experienced professionals with years of expertise in the field always conducts periodic inspections of Ecoba ENT to ensure the proper inspection procedure and identification of the appropriate flaws for correction.
A team of experienced engineers carries out maintenance of the wastewater treatment plant system
The investors’ remarks for the Ecoba ENT personnel include working ethically, finishing projects on schedule, and being devoted to the profession. As a result, each time the project is turned over and placed into operation, or the factory is maintained and maintained on schedule, Ecoba ENT reinforces its prestige brand, devotion to quality work, and operation.
If you want environmental advice or O&M services from Ecoba ENT, please call the O&M hotline at 0918 620 467 or the business hotline at 0901 68 7788 | 08 8899 0789 | 08 9966 0789.