Khởi công nhà máy xử lý nước thải Khu công nghiệp Hòa Phú tỉnh Bắc Giang

Commencement of Wastewater Treatment Plant - Hoa Phu Industrial Zone

04/07/2019 16:11

In the morning 4th July 2019, at Mai Dinh, Hiep Hoa Dist, Bac Giang province “Hoa Phu Industrial Zone Wastewater Treatment Plant” was commenced with the capacity of 2.000 m3/day by Ecoba Environmental Technology Co., LTD is the main contractor for design and construction.

khoi-cong-nha-may-xu-ly-nuoc-thai-khu-cong-nghiep-hoa-phu-1

Attending the ceremony was the investor Phu My Group, supervisor Hoa Phu Industrial Zone and Ecoba Environmental Technology Co., Ltd.,
Hoa Phu Industrial Zone has synchronized, civilized and modern Infrastructure system. The main categories are Traffic road, electricity distribution system, factory, wastewater treatment plant,…Hopefully, Hoa Phu Industrial zone wastewater treatment plant completed, it will be one of the utilities of the industrial zone, attracting. domestic and foreign investors.

khoi-cong-nha-may-xu-ly-nuoc-thai-khu-cong-nghiep-hoa-phu-2

Wastewater after treatment will be quality controlled, the output water pollution indicators are close by automatic monitoring system
The wastewater treatment system is expected to be completed and put into operation in October 2019 with the quality of treated wastewater reaching QCVN on industrial wastewater No. 40: 2011 / BTNMT-column A, meeting the demand for treatment. wastewater treatment for Hoa Phu Industrial Zone, Bac Giang province.

More information, please contact 0901 68 77 88 or 08 9999 0789

 ECOBA ENVIRONMENTAL TECHNOLOGY CO., LTD.
Address: 5 floors, Udic Complex Building, Hoang Dao Thuy Street, Trung Hoa, Cau Giay, Hanoi 
• Hotline: 0901 68 77 88 / 08 9999 0789 
• O&M services: 0918 620 467 
• Email: sales-ent@ecoba.com.vn 
• Websitehttps://www.ecobaent.vn/
• Youtube chanelhttps://www.youtube.com/channel/UCb_b6hk92T00nkHcQpzqTjA



Others news