The wastewater treatment plant in Phu Ha Industrial Park by Ecoba Environmental Technology Co., Ltd (Ecoba ENT) as the main contractor has been completed and put into operation since 2018. The plant is one of the most appreciated infrastructure facilities, contributing to attracting businesses to choose to invest in Phu Ha Industrial Park.
Among 7 industrial zones, 25 industrial clusters in Phu Tho province have been focused on investing in completing infrastructure, Phu Ha Industrial Park invested by Viglacera Corporation is a prominent bright spot with many advantages and approach.
Located right in the prime location of Phu Tho town, Phu Ha Industrial Park is invested synchronously and methodically, including wastewater treatment system, fire protection system, automatic monitoring station to ensure environmental hygiene factors. The technical infrastructure system in Phu Ha Industrial Park is designed and constructed to meet the requirements of the regulations, connecting the technical infrastructure inside and outside the IP.
Phu Ha Industrial Park is invested in synchronous and modern infrastructure by investor Viglacera. Image source: Viglacera
Currently, the wastewater treatment plant in Phu Ha Industrial Park is highly appreciated by investors and is considered as one of the utility factors that contribute to attracting businesses to choose Phu Ha Industrial Park as a manufacturing base.
Besides the modern wastewater treatment system, other infrastructure facilities are also synchronously invested by Viglacera: the industrial park has been additionally installed an online automatic wastewater monitoring station according to regulations; take samples for analysis and make quarterly environmental monitoring reports and register hazardous wastes in the construction phase of the industrial zone phase 1; The system of trees, landscape, traffic, lighting and environmental sanitation is carried out regularly and continuously.
Video introducing the overview of the wastewater treatment plant in Phu Ha Industrial Park
Phu Ha Industrial Park phase 1 with a scale of 356.29 ha is divided into 2 zones: Northern subdivision and Southern subdivision with the total investment of phase 1 is 1,933 billion VND. Up to now, Phu Ha Industrial Park phase 1 has invested in building complete synchronous infrastructure in the Southern area (119.9 ha) and is constructing technical infrastructure in the North (236.39 ha), meeting ability to attract large domestic and foreign enterprises.
Regarding investment attraction, Phu Ha Industrial Park currently has a total area of 86.2 hectares for lease, 73.5 hectares in the South area, 12.7 hectares in the North area for lease to a Japanese enterprise. The area of industrial land that can be further leased is 49.6 ha.
Wastewater treatment plant in Phu Ha Industrial Park is one of the factors attracting investors. Image source: Ecoba ENT
Up to now, Phu Ha Industrial Park has attracted 25 foreign enterprises (17 Korean enterprises, 4 Japanese enterprises, 3 Hong Kong enterprises and 1 Taiwanese enterprise) with a total investment capital of more than 300 million USD operates mainly in the fields of clean and environmentally friendly industries, creating jobs for more than 14,000 workers.
For more information about the wastewater treatment plant in Phu Ha Industrial Park, or to request environmental advice, please contact Ecoba ENT via hotline: 0901 68 7788 | 08 8899 0789 | 08 9966 0789.
Others news